
The Cable Stayed Bridge at Kamla Park, located in Bhopal, was developed by the Bhopal Municipal Corporation to improve urban connectivity and reduce traffic congestion in the city. Construction of the 220-meter-long bridge commenced on 25 August 2014 and was completed on 31 March 2017.
Client
Bhopal Municipal Corporation
Location
Bhopal , Madhya Pradesh
Category
Balanced Cantilever Bridge
State
Madhya Pradesh
Completion Date
Fri Mar 31 2017
Overall Length
220m
Main Bridge Span Arrangement
Cable Stay Span: 55m+110m+55m